000 | 01645cam a2200457 a 4500 | ||
---|---|---|---|
001 | u316793 | ||
003 | SIRSI | ||
005 | 20160811211910.0 | ||
008 | 070307s2008 flua grb 001 0 eng d | ||
010 | _a 2007010013 | ||
040 |
_aDLC _cDLC _dBAKER _dBTCTA _dUKM _dC#P _dYDXCP _dOCLCG _dNLGGC _dOCLCG _dGA0 |
||
020 | _a9781420044201 (alk. paper) | ||
020 | _a1420044206 (alk. paper) | ||
050 | 0 |
_aTS157.5 _bS85 2008 |
|
082 | 0 | 0 |
_a658.5/3 _222 |
084 |
_a85.03 _2bcl |
||
084 |
_a85.35 _2bcl |
||
100 | 1 |
_aSule, D. R. _q(Dileep R.) |
|
245 | 1 | 0 |
_aProduction planning and industrial scheduling : _bexamples, case studies, and applications / _cDileep R. Sule. |
250 | _a2nd ed. | ||
260 |
_aBoca Raton : _bCRC Press, _cc2008. |
||
300 |
_axvi, 534 p. : _bill. ; _c25 cm. |
||
500 | _aRev. ed. of: Industrial scheduling. 1997. | ||
504 | _aIncludes bibliographical references and index. | ||
650 | 4 | _aProgramación de la producción. | |
650 | 0 | _aProduction scheduling. | |
650 | 1 | 7 |
_aProductieplanning. _2gtt |
650 | 1 | 7 |
_aWachttijdproblemen. _2gtt |
650 | 6 | _aOrdonnancement (Gestion) | |
650 | 6 |
_aProduction _xPlanification. |
|
650 | 6 |
_aEntreprises _xPlanification. |
|
650 | 6 | _aPlanification stratégique. | |
650 | 6 | _aAffectation des ressources. | |
700 | 1 |
_aSule, D. R. _q(Dileep R.). _tIndustrial scheduling. |
|
856 | 4 | 1 |
_3Table of contents only _uhttp://www.loc.gov/catdir/toc/ecip0712/2007010013.html |
856 | 4 | 2 |
_3Publisher description _uhttp://www.loc.gov/catdir/enhancements/fy0808/2007010013-d.html |
596 | _a4 | ||
942 | _cLIBRO | ||
999 |
_c158632 _d158632 |