000 01645cam a2200457 a 4500
001 u316793
003 SIRSI
005 20160811211910.0
008 070307s2008 flua grb 001 0 eng d
010 _a 2007010013
040 _aDLC
_cDLC
_dBAKER
_dBTCTA
_dUKM
_dC#P
_dYDXCP
_dOCLCG
_dNLGGC
_dOCLCG
_dGA0
020 _a9781420044201 (alk. paper)
020 _a1420044206 (alk. paper)
050 0 _aTS157.5
_bS85 2008
082 0 0 _a658.5/3
_222
084 _a85.03
_2bcl
084 _a85.35
_2bcl
100 1 _aSule, D. R.
_q(Dileep R.)
245 1 0 _aProduction planning and industrial scheduling :
_bexamples, case studies, and applications /
_cDileep R. Sule.
250 _a2nd ed.
260 _aBoca Raton :
_bCRC Press,
_cc2008.
300 _axvi, 534 p. :
_bill. ;
_c25 cm.
500 _aRev. ed. of: Industrial scheduling. 1997.
504 _aIncludes bibliographical references and index.
650 4 _aProgramación de la producción.
650 0 _aProduction scheduling.
650 1 7 _aProductieplanning.
_2gtt
650 1 7 _aWachttijdproblemen.
_2gtt
650 6 _aOrdonnancement (Gestion)
650 6 _aProduction
_xPlanification.
650 6 _aEntreprises
_xPlanification.
650 6 _aPlanification stratégique.
650 6 _aAffectation des ressources.
700 1 _aSule, D. R.
_q(Dileep R.).
_tIndustrial scheduling.
856 4 1 _3Table of contents only
_uhttp://www.loc.gov/catdir/toc/ecip0712/2007010013.html
856 4 2 _3Publisher description
_uhttp://www.loc.gov/catdir/enhancements/fy0808/2007010013-d.html
596 _a4
942 _cLIBRO
999 _c158632
_d158632